How Quality Controlled For Your Order?
1)2 inspectors check quality every day, Checked one time per 2 hours.
2) First product of every machine starting will be whole size checked.
3) Whole size checked for the first product after changing new knife.
4)Whole size checked for the first product after changing program.
5) Processing inspect rate 20%. Once 1 piece defective, the whole products will be 100% inspected.
6) Before Packing, 20~30% inspected. If defective rate is over 3%, the whole product will be 100% inspected.
In House Production Quality Control System.
4 inspections are proceeded from order arrangment to shipment.
Out Sourcing Quality Control System.
4 Inspections are proceeded from placing order to goods finished.
Ace recognized that : Without Quality, all words are nothing!